head tail filter testing done
This commit is contained in:
@@ -28,10 +28,10 @@ Info: I/O Bank and Globals Assigner identified bank 'Bank4' as being fixed at V
|
||||
|
||||
INFO: Reading User PDC file E:\AbhishekV\rising\ethernet_tpsram_test\constraint\io\io_constraints.pdc. 0 error(s) and 0 warning(s)
|
||||
|
||||
|
||||
|
||||
|
||||
Running Timing based Global Demotion.
|
||||
|
||||
|
||||
Demoted 0 global pins.
|
||||
|
||||
|
||||
@@ -46,29 +46,29 @@ CDC Report:
|
||||
|
||||
Info: I/O Bank and Globals Assigner identified bank 'Bank4' as being fixed at VCCI:2.50V VCCR:n/a
|
||||
|
||||
Info: I/O Bank and Globals Assigner detected (1) out of (7) I/O Bank(s) with locked I/O technologies.
|
||||
|
||||
|
||||
Info: I/O Bank and Globals Assigner detected (1) out of (7) I/O Bank(s) with locked I/O technologies.
|
||||
|
||||
|
||||
|
||||
I/O Bank and Globals Assigner completed successfully.
|
||||
|
||||
Total time spent in I/O Bank and Globals Assigner: 9 seconds
|
||||
|
||||
|
||||
|
||||
|
||||
|
||||
|
||||
|
||||
Placer V5.0 - 2025.1.0
|
||||
|
||||
|
||||
Design: top Started: Wed Apr 15 22:53:55 2026
|
||||
Design: top Started: Fri Apr 17 08:38:08 2026
|
||||
|
||||
|
||||
|
||||
|
||||
|
||||
Initializing High-Effort Timing-Driven Placement ...
|
||||
|
||||
|
||||
Initializing High-Effort Timing-Driven Placement ...
|
||||
|
||||
|
||||
Clustering ...
|
||||
|
||||
|
||||
@@ -79,9 +79,9 @@ Resource Usage
|
||||
|
||||
|
||||
|
||||
|
||||
|
||||
CDC Report:
|
||||
|
||||
|
||||
CDC Report:
|
||||
|
||||
|
||||
Total number of CDC synchronizer driver/sink pairs : 40
|
||||
|
||||
Reference in New Issue
Block a user